JFB bridge as railway station platform access

As a part of revitalization of a railroad in Cieszyn, Poland, new station Cieszyn - University was planned by the Polish Railways (PLK PLK). To access its platform from Kazimierza Brodzińskiego street, a pedestrian bridge was needed due to environment protection requirements. JFB access bridge was selected by the general contractor and delivered within 3 months from order. It includes specific features corresponding PKP PLK requirements, such as leading path.

Partager sur :

Détails du projet

Solution
Fiber Reinforced Bridges
Type
JFB
Longueur
9m
Poids
2m
Poids
3000 kg
Charge
Eurocode LM4
Matériau pont
Fibre-reinforced polymere
Couche d'usure
Epoxy resin, anti-slip
Fiber Reinforced Bridges