JFB bridge as railway station platform access
As a part of revitalization of a railroad in Cieszyn, Poland, new station Cieszyn - University was planned by the Polish Railways (PLK PLK). To access its platform from Kazimierza Brodzińskiego street, a pedestrian bridge was needed due to environment protection requirements. JFB access bridge was selected by the general contractor and delivered within 3 months from order. It includes specific features corresponding PKP PLK requirements, such as leading path.
Détails du projet
Solution
Fiber Reinforced Bridges
Type
JFB
Longueur
9m
Poids
2m
Poids
3000 kg
Charge
Eurocode LM4
Matériau pont
Fibre-reinforced polymere
Couche d'usure
Epoxy resin, anti-slip