Drammen station
In 2020 Janson Bridging Norway AS was asked to work out a technical and commercial proposal for the foot bridge over the railway and a connection footbridge of the Drammen river. The Bybrua bridge over the Drammenselva river will be renewed and a safe passage over the river for pedestrians had to be provided with a temporary solution.
Janson Bridging worked out two separate footbridges, that are connected at the riverside by a special platform. The chosen system was the Janson Panel Footbridge (JPB-p) and the stairs and platforms were designed to fit the project requirements. Our client have installed the bridges in spring and summer of 2022.
Détails du projet
Solution
Pont piétonnier
Type
JPB-P
Longueur totale du pont
65 m
Largeur de surface de roulemen
3 m
Capacité
5 kN/m²
Poids propre
110 t